您要查找的是不是:
- Reverse and normal construction method of deep foundation pit cutting of"One open excavating- Two tunneling" and"Two open excavating - One tunneling" "一明二暗"二明一暗"逆作法和顺作法深基坑挖土施工技术"
- Structure Construction Technique of "Normal Construction Method for Main Building and Top- Down Method for Annex"for Extra High -Rise Building within Narrow Plot 狭小场地建造超高层建筑的"主楼顺作-裙房逆作"结构施工技术
- normal construction method 顺作法
- National Grade Normalized Construction Methods 国家级工法
- The Study of Highway Roadbed Earthwork Construction Method. 高等级公路路基土方施工方法的研究与探讨。
- Construction Method of Light Railway Station of Guangzhou New Baiyun. 建筑。广州新白云国际机场轻轨站施工方法简介。
- Is the contractor experienced in this type of work or construction method? 承包商是否具有施工同样类型建筑的经验?
- This paper presents the construction method of pneumatic rammer piling. 文章介绍了气动夯锤打桩的施工方法。
- Directional drilling is an advanced construction method in river crossing. 定向钻穿越河流是一种比较先进的施工方法。
- Slipform construction method is a mo re advanced concrete construction method. 滑模施工方法是一种较为先进的砼施工方法。
- Results In less severely degenerative cervical discs, the morphology of the cartilage end-plate showed nearly normal construction, and the tidemark was clear. 结果退变程度较轻或基本正常的颈椎间盘,软骨终板结构良好,潮标清晰;
- To create an object, call the constructor method in a class type. 要创建一个对象,应调用类中的构造器方法。
- This paper introduces structure of waveform steel web prestress concrete box girder and construction method for several bridges. 介绍了波形钢腹板预应力混凝土箱梁的结构和几座桥梁的施工方法。
- The results indicate:1) After 28 weeks resting, the cardiac muscle cells of the rats in aerobic training group have the normal construction, and there is no distinct difference between them and the sedentary group. 经过不同强度训练的大鼠完全停止运动28周后,有氧训练组大鼠心肌细胞结构基本正常,与安静对照组大鼠心肌细胞结构相比较没有明显差异; 疲劳训练组大鼠部分心肌细胞轻度肿胀,肌原纤维结构松散,部分线粒体肥大、肿胀,心肌间的胶原纤维明显增生,部分胶原纤维插入心肌细胞内,替代了终未分化的心肌细胞,心脏出现纤维化。
- The towers are normally constructed of cellular sections. 塔柱通常做成空腹断面。
- Compared with the railway bridge and culvert design specifications, the box beam structure design and construction method are seen rational and feasible. 通过有限元分析结果与铁路桥涵设计规范的比较得出,该箱梁结构设计合理,施工方案可行。
- Then,a certificate path construction method is proposed in mixed trust model,and analyze the advantage of the method. 提出了一个在混合信任模型下证书路径构造实现方法,并且分析了其优越性。
- Because the concrete structure was completed before the erection of the steel structure and the site for the erection was limited, the normal construction technique was inapplicable. 本文介绍该工程的结构特点、施工难点、技术方案,以及施工阶段多工况结构分析、整体平移安装工艺、三向承力支承系统、减摩技术、计算机同步控制和姿态调节等关键技术与创新。
- Out plastering wall with mortar thin walled core tube and its construction method were introduced in the paper. 介绍一种轻型墙体-砂浆薄壁芯管外抹灰墙体及其施工方法。
- The site construction ration is the quota of labors, machines and materials consumed in construction work for completing one qualified unit product under reasonable and normal construction conditions. 施工定额是建筑安装工人或工人小组在合理的劳动组织和正常的施工条件下,为完成单位质量合格产品所需消耗的人工、材料、机械的数量标准。