您要查找的是不是:
- peak load time 峰值负荷时间
- Used for page load time metrics. 设置开始下载计时的时钟。
- The load time of all objects is shown visually with time bars. 加载对象的耗时将通过在时间条来直观地展示。
- Demand-side management (DSM) is an effectual means in peak load leveling. 摘要需求侧管理(DSM)是电网移峰填谷的有效手段之一。
- Breaking life lessens when the maximum load time is longer. 随着最大载荷保持时间的增加,层合板的断裂寿命降低。
- FOR THOSE WHO USE DREAMWEAVER CAN USE A TOOL TO CHECK LOAD TIME. 对于使用DREAMWEAVER开拓的人来说,可以使用特定的工具来检测下载时间。
- The peak load current limit is set by the user's selection of a reference voltage and current-sensing resistors. 用户可通过选择参考电压和电流感测电阻设置峰值载荷电流限制。
- On that peak load day, start the Perfmon log on each server at 4:00 A.M and let it run for 24 hours. 在出现高峰负载的那天,于上午4:00在每个服务器上启动Perfmon日志,并让它连续运行24小时。
- Specific performance objects, counters, and instances were collected during peak load and other observation times. 在峰值负载和其他观察期收集了特定的性能对象、计数器和实例。
- Yes, load times are faster across the board. 切换场景读取时间会更快。
- Monitor the ex2003base servers for a 24 hour period on the day that usually experiences peak load (Monday for many companies). 在通常会遇到高峰负载的那天(很多公司是星期一)连续24小时监视ex2003base服务器。
- These pockets were characterized sometimes by low usage, but occasionally by a lack of sufficient resources to handle the peak load. 这些资源的特性是有时使用率很低,但偶尔会因为资源不足而被用来处理一些峰值负载。
- Will the background image increase the loading time too much? 背景图片是否在加载时花费了太多的时间?
- After analyzing the collected data, it was found that the peak load was 2,129 concurrent users averaging 18.8 Requests per second. 分析完收集的数据后发现;峰值负载为2;129个并发用户每秒平均发出18.;8个请求。
- Ammo Feed loading time decreases as Ammunition Link improves. 弹药供给技能的装填时间随着弹药链技能的增高而减少。
- Using GM(1,1) model to predict short-period load has good accuracy, but to the high waving peak load, its accuracy is low. 用GM(1,1)模型预测短期负荷虽具有很好的精确性,但对于波动性较大的高峰负荷,它的预测精度比较低,而马尔可夫模型可以克服负荷波动较大的局限性。
- Discusses the interregional control of power distribution during peak loading. 摘要探讨了在用电峰值时段对多地区之间进行限电分配的问题。
- The load relaxation tests after peak load indicate that rockburst has two types the one is original rockburst, and the other is impellent rockburst. 对岩石峰值载荷后的松弛试验发现具有两类岩爆:一类是本源型岩爆;
- Because these methods are marked as native, the CLR automatically provides the implementation at class load time. 因为这些方法被标记为本机的,所以CLR在类加载时自动提供该实现。
- Weekly operational checks should be carried out at 320MW in presence of shift charge Engineer. Test should be completed before system peak load period. 每星期在值长在场的情况下,机组负荷达到320MW时,进行操作检查。测试应在系统带尖峰负荷前完成。