您要查找的是不是:
- The spillway face are RCC benched spillway face. 溢流坝面为碾压混凝土台阶式溢流面。
- The spillway is opened and the flood runs down rapidly. 泄洪闸打开了,洪水奔流而下。
- The typical seepage flow field of the bottom for the spillway dam is obtai... 最后计算了典型的坝基渗流流场,计算结果与实验结果吻合较好。
- The spillway can't be blocked, otherwise it will cause a serious problem. 不能堵塞洩洪道,否则后果不堪设想。
- A major vertical fault scarp formed during the earthquake was less than 1000 ft from the spillway. 地震时形成的一个主要的垂直断层崖,离溢洪道不到1000英尺。
- The torrent picked up buildings, animals, and human beings and sent them crashing down the spillway . 洪水沿路夹带建筑物残骸、动物及人进入洩洪道。
- Thus the structure type of the spillway and the anti-scour wall are demonstrated and is feasible and teasonable. 从而最终论证溢洪道及防淘墙结构布置形式在水布垭水利枢纽泄洪消能防冲系统中的可行性和合理性。
- The seismic stability analysis shows that the earthquakes are the main causes to quicken the spillway to break down. 然后考虑地震荷载进行结构抗震稳定分析,结果表明地震是加速溢洪道坝段失稳的重要原因。
- The concrete building of the spillway s steep slope section of the Qingshitan reservoir applied sliding form technique. 青狮潭水库溢洪道陡坡段混凝土浇筑,采用滑模技术,能加快施工进度,确保工程质量,保证了建筑物造型的准确和外观质量优良。
- During the 2nd stage river diversion for the Merowe Hydroelectric Power Station,the pontoon is needed to be built downstream the spillway. 在苏丹麦洛维水电站二期导流期间,溢流坝下游需要设置施工浮桥。
- The spillway of a reservoir in Qinghai Province broke down at 6:40, April 28, 2005, which caused its right assistant-dam collapse event. 青海省某水库左右坝上溢洪道于2005年4月28日6:40左右垮塌,造成右副坝垮塌事件。
- After comparing with other kinds of materials used to rapair concrete,the plan is made out to repair the spillway surface in Panjiakou dam. 本文介绍了丙乳砂浆的基本性能,通过混凝土修补材料的性能比较,确立了潘家口水库大坝溢流面修补方案。
- The paper studies the united energy dissipator with the grid and stepped spillway face by means of the spillway of Liudingshan reservoir. 本文以六顶山水库溢洪道为研究对象,采用阶梯式溢流面与格栅相结合的消能工。
- For meeting requirements of the spillway excavation progress and the atone grading, a reasonable blasting technology is a key factor. 为既能满足溢洪道开挖进度的要求,又能使爆破出的石渣符合大坝填筑石料级配的要求,采取合理的爆破技术是关键。
- Since the spillway of Feilaixia Project operates in complicated mode,unfavourable flow phenomenon causes vibration to peirs and gate chamber structure. 飞来峡水利枢纽溢流坝运行工况复杂,存在不利的水流现象,对闸墩和闸室结构产生振动作用,必须进行结构动力设计。
- The spillway of Fengyangshan Reservoir is a flank trough one, according to the local condition, its sluice has used a chequer overfall weir, and the top of the weir is WES-V one. 凤阳山水库溢洪道为侧槽式溢洪道,其泄洪闸采用格仓式溢流堰,堰顶采用WES-V型实用堰。
- The control section of the spillway in the reservoir generally is the spilling weir.But the spill-weir with the sluice culvert is infrequent in the hydraulic work. 摘要水库溢洪道控制段一般为溢流堰形式,而堰体中有泄水洞的溢流堰在水利工程中并不多见。
- However, scouring in different degrees has occurred downstream the spillway and the release runnel.In the light of this situation, a revetment has been designed and constructed. 为此,针对泄洪洞和溢洪道出口下游冲刷流态等实际情况,进行了护岸工程的设计和施工。
- The wind whirled the dead leaves about. 风吹得枯叶在四处回旋。
- To lower prices and difficulties,an experiment to optimize the left diversion wall of the spillway on the right bank of a certain water hinge in Shanxi has been done. 为降低工程造价和施工难度,陕西某水利枢纽右岸溢洪道左导墙进行了优化定型实验。